Monday 26 January 2015

Reno- hopefully the last week

As we step into a new week, we hope that this will be the last week of our reno (faster faster!). We need to get the lights, toilet accessories, sinks, kitchen stove, room doors etc installed this week.

One of the new updates our ID sent us today. But it was only becos she wanted to check if it was done rite, hmph. The workers came to do the textured paint for the kitchen walls and living room wall. The textured paint is something like cement screeding but apparently will not crack as it is a paint. The downside is that it is costly and is one of the big-ticket items of our reno. But we decided to bite the bullet as we dun wan problems with the cement screed in a year's time.

What the kitchen looked like before the guys came. Our silestone top was installed and we still have to adjust the height of the kitchen hood.

Random picture becos I haven't posted our master bedroom wardrobe. Hmm, our toilet really looked very dark hor, lol.

No comments: